*All information should be confirmed with the town boards.
From BOH - Lot can support a 2 bedroom system with a standard Title 5 or 3 bedrooms with an enhanced system.
From Water Department - Town water runs down Sixth Street N. Buyer will need to hook up from the road.
From Building/Zoning Department - Lot can support a house and an ADU, by right, with proper permitting.
From Wastewater Dept. - Sewer is expected to run down Sixth Street N in 5 years or so. At that time, buyer will have 2 years to connect to sewer once a letter is received from the town. |